The ground testing of the Saab Gripen E combat jet is in full swing ahead of maiden flight scheduled for second quarter of 2017.
Validation and verification activities such as tests in rigs and simulators have been performed. Since roll-out of first prototype 39-8, in May 2016, major milestones such as powering on the aircraft and engine start were achieved.
Currently the prototype is
↧